ứng dụng cờ bạc thể thao - bet365ee

    • vi
    • en
    • vi
    • en

DEOCA Infrastructure

Featured Projects

THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 11,378 BILLION VND

THE CONSTRUCTION PROJECT OF DEO CA TUNNEL, CO MA TUNNEL AND LEADING ROADS

Deo Ca tunnel is a national key traffic work, recognized by the Ministry of Construction as one of the five...

Read More
THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 11,378 BILLION VND

THE CONSTRUCTION PROJECT OF DEO CA TUNNEL, CO MA TUNNEL AND LEADING ROADS

Deo Ca tunnel is a national key traffic work, recognized by the Ministry of Construction as one of the five typical national works on the occasion of the 60th anniversary of Vietnam’s traditional day of the Construction industry.

Deo Ca tunnel project has a total length of 13,190m, starting from Km1353+150 (National Road 1A) in Hoa Xuan Nam commune, Dong Hoa district (Phu Yen province) and ending at Km1374+525 in Van Tho commune, Van district Ninh (Khanh Hoa province). In which, Deo Ca tunnel is 4,125m long, Co Ma tunnel is 500m long and 8,565m of leading roads. Each tunnel system has two parallel tunnels designed 30m apart, each tunnel is 9.75m wide including two lanes, safety strip and tunnel maintenance corridor,the designed speed is 80km/h.

The project started on November 18, 2012. After more than 4 years of effort and overcoming many challenges, by the beginning of September 2017, the project was not only completed but also 4 months ahead of schedule. After putting the tunnel into operation, the travel time through the tunnel is only 10 minutes instead of 45 minutes when going on Ca pass. At the same time, the traffic congestion and accident black spots on the pass road are eliminated.

THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 4,627 BILLION VND

CU MONG TUNNEL CONSTRUCTION PROJECT

Cu Mong Tunnel Construction Project, which connects Binh Dinh and Phu Yen provinces, has a total length of...

Read More
THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 4.627 BILLION VND

CU MONG TUNNEL CONSTRUCTION PROJECT

Cu Mong Tunnel Construction Project, which connects Binh Dinh and Phu Yen provinces, has a total length of 6,62km including 2.600m of the tunnel length and 4.020m of the path length. The starting point of the project is at Km1239+119 of National Roadway 1 (in Binh Dinh) and the end point of that at Km1247+739 of National Roadway 1 (in Phu Yen). Two bridges of the project are 36m long. The path is designed according to road standards of Grade III (TCVN 4054-2005) with the design speed is 80km/h.
The project was started building on September 26, 2015. After over three years of overcoming difficulties for construction, on January 15, 2019, the project was offically accepted and put into operation, which is 2,5 months ahead of schedule. Since then, it has only taken 6 minutes for vehicles by traveling through the tunnel instead of 30 minutes by the pass.

THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 7,296 BILLION VND

HAI VAN TUNNEL EXPANSION PROJECT

Hai Van tunnel is the longest road tunnel in Southeast Asia, and is a work to celebrate the 13th National...

Read More
THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 7,296 BILLION VND

HAI VAN TUNNEL EXPANSION PROJECT

Hai Van tunnel is the longest road tunnel in Southeast Asia, and is a work to celebrate the 13th National Party Congress. This is a record construction, affirming the capacity and intelligence of Vietnamese people and Vietnamese enterprises in implementing an international project.

The project has a total length of more than 12.6km, the starting point is in Lang Co town, Phu Loc district (Thua Thien Hue province) and the end point is in Hoa Hiep Bac ward, Lien Chieu district (Da Nang city). The project had been started in 2016 and invested in 2 phases. In phase 1, upgrading, repairing Hai Van 1 tunnel and repairing the road through Hai Van pass. The construction term is from April 2016 to August 2017. In phase 2, implementing construction and expansion of Hai Van 2 tunnel with a total length of more than 12.6km. The construction term is from December 2016 to January 2021. Since Hai Van 2 tunnel is put into operation, the travel time between 2 provinces has been reduced to only about 15 minutes instead of more than 60 minutes when going through the pass road.

THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 1.842 BILLION VND

PHUOC TUONG – PHU GIA ROAD TUNNELS CONSTRUCTION PROJECT

Phuoc Tuong - Phu Gia Road Tunnels Construction Project, which located on National Roadway 1 through Phuc Loc district, Thua...

Read More
THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 1.842 BILLION VND

PHUOC TUONG – PHU GIA ROAD TUNNELS CONSTRUCTION PROJECT

Phuoc Tuong – Phu Gia Road Tunnels Construction Project, which located on National Roadway 1 through Phuc Loc district, Thua Thien Hue province, was started building on May 18, 2014 and put into use from June 29, 2016.
Phuoc Tuong tunnel has a length of 375m and its path is 4.200m long. Phu Gia tunnel has a length of 447m and its path is 2.600m long. Both tunnels are 11,5m wide including two lanes with their design speed of 80km/h.

THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 12,188 BILLION VND

BAC GIANG - LANG SON EXPRESSWAY CONSTRUCTION INVESTMENT PROJECT

Bac Giang - Lang Son expressway project has a total length of 64.9km, the starting point is at Km45+100 (intersect...

Read More
THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 12,188 BILLION VND

BAC GIANG - LANG SON EXPRESSWAY CONSTRUCTION INVESTMENT PROJECT

Bac Giang – Lang Son expressway project has a total length of 64.9km, the starting point is at Km45+100 (intersect with National Road 1 at Sao Mai, Chi Lang, Lang Son province), the end point is Km108 + 500, connecting with the end point of the upgrade and expansion National Road 1 project, section Hanoi – Bac Giang.

Bac Giang – Lang Son expressway project was first started in 2015, but due to the old investor’s inability, unable to arrange capital, the project came to a standstill for nearly 2 years. By April 2017, Deo Ca had taken over the project and implemented many solutions to handle problems, enhance the capital and organize construction simultaneously. After 2 years of restarting like a miracle, in December 2019, Bac Giang – Lang Son expressway was officially opened to traffic, 3 months ahead of schedule. Not only bringing the project to the finish line beyond the plan, Deo Ca also set a progress record when completing 64.9km of expressway within only 2 years.

THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 2.644 BILLION VND

THE NATIONAL ROADWAY 1 EXPANSION PROJECT OF SECTIONS KM1374+525 – KM1392 AND KM1405 – KM1425 (IN KHANH HOA PROVINCE)

In the transport development strategy of the Government until 2020 with the vision until 2030, the development orientation...

Read More
THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 2.644 BILLION VND

THE NATIONAL ROADWAY 1 EXPANSION PROJECT OF SECTIONS KM1374+525 – KM1392 AND KM1405 – KM1425 (IN KHANH HOA PROVINCE)

In the transport development strategy of the Government until 2020 with the vision until 2030, the development orientation of road transport infrastructure gives priority for investment in upgrading and expanding National Roadway 1A, which is expected to be largely completed in 2015 and fully completed in 2020. One of them is the National Roadway 1 Expansion Project of Sections Km1374+525 – Km1392 and Km1405 – Km1425 (in Khanh Hoa province).
The project was started building on May 26, 2013 in Co Ma village, Van Tho commune, Van Ninh district, Khanh Hoa province. The total length of the project is 37,5km (excluding the section Km1392 – Km1405 through Van Gia town). The starting point of the project is at Km1374 + 525 in Van Ninh district, Khanh Hoa (bordering on the end point of Deo Ca Tunnel Project). The end point of that is at Km1425 in Ninh Hoa town, Khanh Hoa. The direction of the project is aligned National Roadway 1. There are 18 bridges of the whole project with a total length of 575,45m.

The total construction investment amount: 12,668 billion VND

TRUNG LUONG - MY THUAN EXPRESSWAY CONSTRUCTION INVESTMENT PROJECT

Trung Luong - My Thuan expressway project has the starting point at Than Cuu Nghia intersection (prolongs Ho Chi Minh...

Read More
THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 12,668 BILLION VND

TRUNG LUONG - MY THUAN EXPRESSWAY CONSTRUCTION INVESTMENT PROJECT

Trung Luong – My Thuan expressway project has the starting point at Than Cuu Nghia intersection (prolongs Ho Chi Minh City – Trung Luong Expressway) and the end point crosses with National Road 30 at An Thai Trung intersection (the north of My Thuan Bridge intersection, Cai Be District, Tien Giang Province). Total length of the whole route is 51.5km.

The project was first started in 2009, but because the old investor was incompetent and the capital was not promtly arranged, the project was terminated for nearly 10 years. In March 2019, the project investor consortium invited Deo Ca Group to participate in management and administration to remove obstacles and continue implementing the project.

 

Under the management and administration of Deo Ca Group, Trung Luong – My Thuan Expressway was connected, meeting the guidance of the Prime Minister (to open before December 31, 2020). Currently, the project is in the sprint phase to be completed by the end of 2021.

The completion of Trung Luong – My Thuan Expressway will shorten the travel time from Ho Chi Minh City to the Mekong Delta provinces, as well as solve the overload for National Road 1A.

bet365ee is the general contractor

The total construction investment amount: 8,925 billion VND

THE NORTH - SOUTH SOUTH EXPRESSWAY COMPONENT PROJECT, SECTION CAM LAM - VINH HAO

Cam Lam - Vinh Hao Expressway has a total length of 78.5km, the starting point is at Km54+00, Cam Ranh...

Read More
The total construction investment amount: 8,925 billion VND

THE NORTH - SOUTH SOUTH EXPRESSWAY COMPONENT PROJECT, SECTION CAM LAM - VINH HAO

Cam Lam – Vinh Hao Expressway has a total length of 78.5km, the starting point is at Km54+00, Cam Ranh intersection (connecting with the endpoint of Nha Trang – Cam Lam expressway project) in Cam Thinh Tay Commune, Cam Ranh City, Khanh Hoa province; the endpoint is at Km134+00, Vinh Hao intersection (connecting with the starting point of the Vinh Hao – Phan Thiet expressway project) in Vinh Hao commune, Tuy Phong district, Binh Thuan province.

The route is designed under expressway standards. In the first investment phase, the expressway has a scale of 4 lanes, the roadbed is 17m wide with a design speed of 80km/h. Nui Vung tunnel item has a length of 2.2km, designed with 3 lanes and 14m wide, the fourth largest in the country after Hai Van, Deo Ca and Cu Mong tunnels. The project also has bridges and interchanges (overpass or underpass). In the completion phase, the scale will be up to 6 lanes, the width of the roadbed is 32.35m.

bet365ee is the general contractor of the project.

The total construction investment amount 8,743 billion VND

HUU NGHI - CHI LANG EXPRESSWAY PROJECT

Huu Nghi - Chi Lang Expressway has a total length of 43km and a design speed of 80km/h. The starting point of the project is...

Read More
The total construction investment amount: 8,743 billion VND

HUU NGHI - CHI LANG EXPRESSWAY PROJECT

Huu Nghi – Chi Lang Expressway has a total length of 43km and a design speed of 80km/h. The starting point of the project is at Km1+800 in Dong Dang town, Cao Loc district, Lang Son province and the ending point is at Km44+749.67 (connecting with the starting point of Bac Giang – Lang Son expressway) in Sao Mai commune, Chi Lang district, Lang Son province.

Huu Nghi – Chi Lang expressway project is planned to connect with Bac Giang – Lang Son expressway, completing the expressway route from Hanoi to Huu Nghi border gate to serve goods trading across the Vietnam-China border and develop socio-economics of the Northeast provinces.

bet365ee is the investor and contractor of this project.

The total construction investment amount: 21,615 billion VND

DONG DANG - TRA LINH EXPRESSWAY CONSTRUCTION INVESTMENT PROJECT

Dong Dang - Tra Linh Expressway Construction Investment Project has a total length of 115km and a design speed of...

Read More
The total construction investment amount: 21,615 billion VND

DONG DANG - TRA LINH EXPRESSWAY CONSTRUCTION INVESTMENT PROJECT

Dong Dang – Tra Linh Expressway Construction Investment Project has a total length of 115km and a design speed of 80km/h. The starting point of the project is at Km0+00, which is the intersection of Tan Thanh border gate area, Van Lang district, Lang Son province. The end point of that is at Km115+00, which is in Tra Linh border gate area, Trung Khanh district, Cao Bang province.

The project is invested in two phases. In the first phase from now to 2024, it has been invested about 93km of the expressway from Lang Son to Quang Hoa district (Cao Bang) with 17m wide road-bed. In the second phase after 2025, it is going to be invested in about 22 km of the expressway to Tra Linh border gate (Cao Bang).

Currently, the distance from Hanoi capital to Cao Bang is 280km long, which takes about from 5 to 6 hours to travel by car. After the completion of the Huu Nghi – Chi Lang and Dong Dang – Tra Linh expressways, the estimated travel time from Hanoi to Cao Bang will be shortened to about from 2 to 2,5 hours.

The total construction investment amount 553 billion VND

PRENN PASS UPGRADE AND EXPANSION PROJECT

Prenn Pass is the gateway route connecting Da Lat city with Lien Khuong airport, Dau Giay - Lien Khuong expressway, and is a vital road...

Read More
THE TOTAL CONSTRUCTION INVESTMENT AMOUNT: 553 tBILLION VND

PRENN PASS UPGRADE AND EXPANSION PROJECT

The project to upgrade and expand Prenn Pass was started construction on February 10, 2023 with a total investment of 553 billion VND assigned by the joint venture of Deo Ca Construction Joint Stock Company (DCC) and Infrastructure Investment Joint Stock Company. implemented by Deo Ca ( bet365ee ). After nearly 1 year of construction, all project items such as road surfaces, lighting works, rerouted bridges, guardrails… have been completed with 100% volume, ensuring the set schedule.

Prenn Pass with a length of about 7.4km is the gateway connecting Da Lat city with Lien Khuong airport, Dau Giay – Lien Khuong expressway, which is a vital traffic route to the city. Ho Chi Minh and southern provinces. The pass has an old road surface that is only 7m wide with 2 lanes, passes through high mountainous terrain and many sections of the route are quite winding, affecting the visibility of traffic participants, causing unsafety. The traffic flow on the route is very large, and congestion often occurs.

The total construction investment amount: 1,203 billion VND

Coastal road project connecting Lien Chieu port

The Coastal Road project connecting Lien Chieu port has a total investment of more than 1,203 billion VND, expected to...

Read More
TThe total construction investment amount: 1.203 1,203 billion VND

Coastal road project connecting Lien Chieu port

The Coastal Road project connecting Lien Chieu port has a total investment of more than 1,203 billion VND, expected to be completed and put into use in 2025. The starting point of the project connects with the route outside Lien Chieu port, the ending point intersects at a different level. with the Hai Van – Tuy Loan southern bypass. Main route cross section is 30m, 6 lanes, design speed 60 km/h.

The consortium of contractors includes Deo Ca Traffic Infrastructure Investment Joint Stock Company ( bet365ee ), Dacinco Construction Investment Company Limited – Phu Vinh Construction Company Limited – Xuan Quang Construction Joint Stock Company – Construction Company Limited Nhat Huy Construction and Trading – Viet Anh Investment Joint Stock Company carried out the construction package of the Coastal Road connecting Lien Chieu port worth more than 957.5 billion VND.

The bidding package carried out by the bet365ee joint venture has a length of nearly 3km, high-grade A1 pavement structure, including construction items of grade-level overpasses at the intersection at the beginning of the route with the North-South railway and Nguyen Van Cu street ( National Highway 1A), overpass at the intersection at the end of the route with Hai Van – Tuy Loan bypass, underpass on the road to Suoi Luong, internal underpass at Lien Chieu Industrial Park…

The total construction investment amount 16,408 billion VND

TAN PHU - BAO LOC EXPRESSWAY CONSTRUCTION INVESTMENT PROJECT

Tan Phu - Bao Loc Expressway Construction Investment Project has a total length of 67km and a design speed of 80km/h. The...

Read More
The total construction investment amount: 16.408 billion VND

TAN PHU - BAO LOC EXPRESSWAY CONSTRUCTION INVESTMENT PROJECT

Tan Phu – Bao Loc Expressway Construction Investment Project has a total length of 67km and a design speed of 80km/h. The starting point of the project is at Km59+594, which is intersecting with National Roadway 20 at Km69+400 in Phu Trung commune, Tan Phu district, Dong Nai province. The end point of that is at Km126+360, which is intersecting with Nguyen Van Cu street, Bao Loc city, Lam Dong province. It, which is in the planning of Dau Giay – Lien Khuong Expressway, is the first project in Vietnam implemented under the public-private partnership method after the Law on public-private partnership investment came into effect.

After completed, Tan Phu – Bao Loc Expressway will contribute to attracting investment and reducing traffic pressure for National Roadway 20, solving the “black spot” of traffic at Bao Loc Pass. It will also connect the transport system with neighboring areas, some districts (Da Huoai, Da Teh, Bao Lam) and Bao Loc city of Lam Dong, Central Highlands and Southeast and South Central Coast provinces.

bet365ee and Deo Ca Group have been involved in researching and proposing the project since 2020.